Desalination Plant, Pump house and Pipe line Installation
Client: Water Delivery Alliance Pty Ltd
Principal: Synergy Resource Management Pty Ltd
Contact: Andrew Reardon (0401 807 727)
Date Completed: November 2007
Project Value: 60,000 – $100,000
Description of Project:
Connect was engaged to design build a turn key system for a ground water monitoring and ground water extraction. The system was built on behalf of Water Delivery Alliance.
The electrical component included the design, building and programming of a PLC controlled switchboard with safety switch’s, contractors, sensors level switches, circuit protection, plugs outlets etc.,
During the course of the project we were asked to design and build a control cabinet including a PLC for a Pilot Water Treatment System. Once the water treatment system was built it was used to treat all the water extracted through wells will excavation and the construction of the pump house was carried out.
Another Water treatment system was built to treat water extracted liquid from the drilling and ground water along the 18km pipe line route delivering clean from Sydney’s Desalination Plant at Kurnell to Erskinville into Sydney Waters main distribution network.